{{$storage.wishlist.length}}

Visual Fireworks in the Making

Posted June 24, 2020

All-Star Renovation Challenge Week 3

With only two weeks left until the big reveals in the All-Star Renovation Challenge each designer has been hard at work with some big changes happening. 

Shara placed a new tub in the master suite for her parents, while also tidying up some tile and paint with partner Behr and FrogTape. 

Virginia created a tiled masterpiece to welcome guests into her basement B&B. It’s too cute and she shared all the details on how to create this for your home here

Planning, prep, progress, and the ever-changing design were all common themes this week. Nicole switched up the layout of her tile design a few times before settling on an amazing pattern to be seen here

The outdoor playhouse is taking on a life of its own as Lindi + Russell powered through and made some serious progress. From electrical, insulation to waterproofing this kids’ playhouse is almost ready for move-in. 

Taking things to new heights, Jessie created a custom concrete look to her ceiling thanks in part to Behr Paint and FrogTape to create a work of art that rivals Michael-Angelo. Ok, well maybe not that intricate but it impressed the fans. 

Working on the details this week Emily shared her thoughts on two different directions you can take when pairing paint and tile options to get custom looks.  See which one she landed on here

Kelsey + Ryan tiled all the things this week and things are really taking shape. With a beautiful patterned tile for their vanity to their floors adding a wood-look with our Teakwood tile, their master bath is quickly becoming an at-home oasis. And, those Jeffrey Court socks don’t hurt either.

With so much progress happening and getting closer to the big reveals, be sure to vote daily for your favorite designs. Only your votes can name a winner. Click to see the designs and vote. 